The Guanajuato property overlies the core of the prolific Veta Madre silver-gold structure. These world-class low sulfidation epithermal deposits to date have total production of over one billion ounces silver and 4 million ounces gold over a 450 year mining history. One marvellous aspect of world class deposits is their defiance of typical size due to multiple phase, overlapping events. This is borne out by structural studies and fluid inclusion work. The fluid inclusion work has shown that boiling horizons (and associate silver-gold deposition) occur over a vertical range of at least 600 metres below the present surface. There are consistent structural aspects between the various deposits on the Guanajuato property, which include bends, step-over and cymoid loops.
To a certain degree deep extensions of mineralization can be found by following known deposits down plunge to depth. Drill hole EUG10-057 has shown that systematic drilling can discover new "blind" mineralized zones. Many zones at Guanajuato are relatively small, but as history has shown, conditions are primed for world-class low sulfidation epithermal silver-gold systems.
Resource Estimate
When Great Panther acquired the Guanajuato Mines in 2005, there were no NI43-101 compliant resources and the Company had to rehabilitate the mine in order to begin establishing a new resource base at depth. Since then, five NI 43-101 have been completed.
During 2015, exploration at the San Ignacio Mine consisted of underground drilling to better define the Mineral Resource in the Intermediate and Melladito zones, and a surface drill program to define Mineral Resource in the Melladito, Melladito Splay, Melladito 2 and Melladito 3 zones. Development in 2015 was conducted along the Melladito, Melladito Splay, Melladito 2, and Intermediate zones. At the Guanajuato Mine, exploration was focused in the Valenciana, San Cayetano, and Los Pozos areas to increase the Mineral Resource.
At San Ignacio, plans for 2016 include the continuation of surface exploration south from the present mineral resource to the historic mining area of San Pedro. Underground drilling will focus on converting Inferred Mineral Resources to the Measured and Indicated categories. At the Guanajuato Mine, the focus of exploration in 2016 will be at the Los Pozos, Guanajuatito, and Valenciana zones. A compilation of the historical workings is being undertaken with a focus on parallel and sigmoidal veins with mineralization of economic significance. This will include the Rayas, upper Cata, Los Pozos, Valenciana and Guanajuatito zones.
The San Ignacio Mine contains estimated M&I Mineral Resources of 360,352 tonnes above a US$74/tonne cut-off, at an average grade of 145g/t silver and 3.20g/t gold, for a total of 4,301,214 Ag eq oz. This includes Measured Mineral Resources of 249,810 tonnes at an average grade of 151g/t silver and 3.39g/t gold, for a total of 3,130,365 Ag eq oz and Indicated Mineral Resources of 110,542 tonnes at an average grade of 133g/t silver and 2.79g/t gold, for a total of 1,170,848 Ag eq oz. In addition, estimated Inferred Mineral Resources are 770,950 tonnes at an average grade of 138g/t silver and 2.76g/t gold, for 8,266,229 Ag eq oz. The effective date of the San Ignacio Mine Mineral Resource is December 31, 2015 (details tabulated and noted below).
The Guanajuato Mine contains estimated M&I Mineral Resources of 149,716 tonnes above a US$74/tonne cut-off, at an average grade of 269g/t silver and 1.50g/t gold, for a total of 1,808,003 Ag eq oz. This includes Measured Mineral Resources of 90,365 tonnes at an average grade of 285g/t silver and 1.81g/t gold, for a total of 1,200,576 Ag eq oz, and Indicated Mineral Resources of 59,352 tonnes at an average grade of 245g/t silver and 1.04g/t gold, for a total of 607,427 Ag eq oz. In addition, estimated Inferred Mineral Resources are 135,571 tonnes at an average grade of 151g/t silver and 2.30g/t gold, for 1,363,328 Ag eq oz. The Mineral Resource classified as Geological Potential was estimated within ranges for areas that contain historic stopes with limited topographic control. This includes areas drilled and evaluated underground including Promontorio, parts of Los Pozos, and parts of Valenciana. The effective date of the Guanajuato Mine Mineral Resource is July 31, 2015 (details tabulated and noted below).
The El Horcon Project contains an Inferred Mineral Resource estimated at 128,732 tonnes above a US$110/tonne cut off grading 3.64g/t Au, 82g/t Ag, 2.97% Pb, and 4.11% zinc for the Diamantillo, Diamantillo HW, Natividad, and San Guillermo veins. The effective date of the El Horcon Project Mineral Resource is July 31, 2015 (details tabulated and noted below).
Summary Table of the Updated 2015 Mineral Resource Estimate for the Guanajuato Mine Complex¹
MEASURED |
|||||||||||||||
Mine |
Tonnes |
Ag (g/t) |
Ag (oz) |
Au (g/t) |
Au (oz) |
Ag eq (g/t) |
Ag eq (oz) |
||||||||
San Ignacio1 |
249,810 |
151 |
1,210,144 |
3.39 |
27,199 |
390 |
3,130,365 |
||||||||
Guanajuato1 |
90,365 |
285 |
828,971 |
1.81 |
5,264 |
413 |
1,200,576 |
||||||||
Total Measured |
340,175 |
187 |
2,039,115 |
2.97 |
32,463 |
396 |
4,330,941 |
||||||||
INDICATED |
|||||||||||||||
Mine |
Tonnes |
Ag (g/t) |
Ag (oz) |
Au (g/t) |
Au (oz) |
Ag eq (g/t) |
Ag eq (oz) |
||||||||
San Ignacio1 |
110,542 |
133 |
471,862 |
2.79 |
9,901 |
329 |
1,170,848 |
||||||||
Guanajuato1 |
59,352 |
245 |
467,740 |
1.04 |
1,979 |
318 |
607,427 |
||||||||
Total Indicated |
169,894 |
172 |
939,602 |
2.18 |
11,880 |
325 |
1,778,275 |
||||||||
MEASURED & INDICATED |
|||||||||||||||
Mine |
Tonnes |
Ag (g/t) |
Ag (oz) |
Au (g/t) |
Au (oz) |
Ag eq (g/t) |
Ag eq (oz) |
||||||||
San Ignacio1 |
360,352 |
145 |
1,682,007 |
3.20 |
37,099 |
371 |
4,301,214 |
||||||||
Guanajuato1 |
149,716 |
269 |
1,296,710 |
1.50 |
7,242 |
376 |
1,808,003 |
||||||||
Total M & I |
510,068 |
181 |
2,978,717 |
2.70 |
44,341 |
372 |
6,109,217 |
||||||||
INFERRED |
|||||||||||||||
Mine |
Tonnes |
Ag (g/t) |
Ag (oz) |
Au (g/t) |
Au (oz) |
Ag eq (g/t) |
Ag eq (oz) |
||||||||
San Ignacio1 |
770,950 |
138 |
3,428,532 |
2.76 |
68,523 |
333 |
8,266,229 |
||||||||
Guanajuato1 |
135,571 |
151 |
656,429 |
2.30 |
10,013 |
313 |
1,363,328 |
||||||||
Subtotal |
906,521 |
140 |
4,084,961 |
2.69 |
78,536 |
330 |
9,629,557 |
||||||||
El Horcon1,2 |
128,732 |
82 |
339,373 |
3.64 |
15,034 |
461 |
1,906,123 |
||||||||
Total Inferred |
1,035,253 |
133 |
4,424,334 |
2.81 |
93,570 |
346 |
11,535,680 |
||||||||
GEOLOGICAL POTENTIAL |
|||||||||||||||
Mine |
Range Tonnes |
Range Grade Ag (g/t) |
Range Grade Au (g/t) |
||||||||||||
Low |
High |
Low |
High |
Low |
High |
||||||||||
Guanajuato |
199,700 |
288,500 |
123 |
144 |
1.87 |
2.20 |
|||||||||
¹ Mineral Resource Estimates for Guanajuato and El Horcon use an effective date of July 31, 2015 while San Ignacio uses an effective date of December 31, 2015; and all used a metal price outlook of US$15.00/oz silver and US$1,100/oz gold.
² Silver equivalent calculations for El Horcon include lead content but not zinc, as the zinc would not be recovered in the Guanajuato plant.
Notes:
- US$74 per tonne Cut-off
- Silver equivalent was calculated using a 70.6 to 1 ratio of silver to gold value
- Rock density for Intermediate 2, Melladito, Melladito 2, and Melladito 3 is 2.62t/m³, for Nombre de Dios is 2.63t/m³, for Intermediate and Melladito Splay are 2.64t/m³, and for Nombre de Dios 2 is 2.65t/m³
- Totals may not agree due to rounding
- Grades in metric units
- Contained silver and gold in troy ounces
- Minimum true width 1.5m
- Metal Prices US$15.00/oz silver, and US$1,100/oz gold