Sign up for the latest news and updates
Sign UpApril 15, 2013
- Ore processed was up 36% to 69,540 tonnes;
- Metal production increased 9% to 607,501 silver equivalent ounces ("Ag eq oz") (at a 60:1 silver:gold ratio);
- Silver production rose 3% to 369,624 silver ounces ("Ag oz"); and
- Gold production saw a 15% increase to 3,144 gold ounces ("Au oz").
"We are pleased that our operational results for Q1 were ahead of plan and we expect that the cost reduction and efficiency efforts we have initiated will begin to be realized in future quarters" stated
| Consolidated Q1 Operations Summary | Q1 2013 | Q1 2012 | Change |
| Ore processed (tonnes milled) | 69,540 | 51,198 | 36% |
| Silver equivalent ounce production1 | 607,501 | 557,606 | 9% |
| Silver ounce production | 369,624 | 359,526 | 3% |
| Gold ounce production | 3,144 | 2,729 | 15% |
| Lead production (lbs) | 631,373 | 445,334 | 42% |
| Zinc production (lbs) | 989,416 | 687,842 | 44% |
| Total underground development (m) | 4,123 | 4,543 | (9)% |
| Underground diamond drilling (m) | 7,540 | 7,167 | 5% |
For the first quarter, the
| Guanajuato Q1 Operations Summary | Q1 2013 | Q1 2012 | Change |
| Ore processed (tonnes milled) | 52,545 | 38,794 | 35% |
| Silver equivalent ounce production1 | 399,417 | 396,192 | 1% |
| Silver ounce production | 222,906 | 239,305 | (7)% |
| Gold ounce production | 2,942 | 2,615 | 13% |
| Ag grade (g/t) | 148 | 213 | (31)% |
| Au grade (g/t) | 1.93 | 2.30 | (16)% |
| Ag recovery (%) | 89% | 90% | (1)% |
| Au recovery (%) | 90% | 91% | (1)% |
| Total underground development (m) | 1,867 | 1,940 | (4)% |
| Underground diamond drilling (m) | 7,134 | 6,010 | 19% |
The majority of the metal production during the quarter was from the lower levels of
Development towards the 510 metre level continued along the
Exploration drilling was carried out in Cata at the 525 metre level, aiming to accurately define the mineralized block through short boreholes between the 525 and 550 metre levels as the ramp is extended to depth.
During the quarter, improvements were made to the crushing section of the Cata processing plant by optimizing the double-deck screen installed in the fourth quarter. In addition, the installation of a HP300 Cone Crusher significantly improved the crushing capacity at the plant.
For the first quarter, 16,995 tonnes were processed at Topia, up 37% compared to the same period in 2012, at ore grades of 300g/t Ag, 0.65g/t Au, 1.81% lead ("Pb") and 2.94% zinc ("Zn").
Metal production included 146,718 Ag oz, 202 Au oz, 631,373 Pb lbs, and 989,416 Zn lbs, or 208,084 Ag eq oz, which is up 29% over the same period in 2012.
Plant metallurgical performance was satisfactory with metal recoveries of 89.4% for silver, 56.6% for gold, 93.2% for lead, and 89.7% for zinc.
| Topia Q1 Operations Summary | Q1 2013 | Q1 2012 | Change |
| Ore processed (tonnes milled) | 16,995 | 12,404 | 37% |
| Silver equivalent ounce production1 | 208,084 | 161,415 | 29% |
| Silver ounce production | 146,718 | 120,221 | 22% |
| Gold ounce production | 202 | 114 | 77% |
| Lead production (lbs) | 631,373 | 445,334 | 42% |
| Zinc production (lbs) | 989,416 | 687,842 | 44% |
| Ag grade (g/t) | 300 | 326 | (8)% |
| Au grade (g/t) | 0.65 | 0.45 | 44% |
| Ag recovery (%) | 89% | 90% | (2)% |
| Au recovery (%) | 57% | 64% | (11)% |
| Total underground development (m) | 2,256 | 2,603 | (13)% |
| Underground diamond drilling (m) | 406 | 668 | (39)% |
Metal production from Topia's main mines, the 1522 mine and Durangueño, experienced increasingly narrow vein formations which resulted in higher dilution and lower silver grades for the quarter. Management is conducting a mine by mine review of the 14 Topia mines to determine where to best concentrate its mining efforts.
During the first quarter the Company received the explosives permit and began the rehabilitation of the
It is expected that the Land Use permit and the Environmental Impact Assessment approvals will be received in the third quarter.
El Horcon
At El Horcon the baseline studies for the
A surface drill program is planned to commence immediately (
Outlook
The focus for 2013 is to improve and strengthen the operational efficiency of the existing operations and expand the platform for more significant growth in 2014 and beyond.
The Company confirms its estimate of metal production in the range of 2.4 to 2.5 million silver equivalent ounces for 2013, while the goals for this year are to:
- Increase cash flow from mine operations by cutting costs and improving operating efficiency;
- Aggressively drive the development of
San Ignacio with the view to production in 2014, to augment existing production atGuanajuato ; - Commence the exploration drilling at El Horcon; and
- Review acquisition opportunities.
ABOUT GREAT PANTHER
For further information, please visit the Company's website at www.greatpanther.com, e-mail info@greatpanther.com.
This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the Canadian securities laws (together, "forward-looking statements"). Such forward-looking statements may include but are not limited to the Company's plans for production at its